Wednesday, October 27, 2010

EXP 2: Week 3: Town Hall Station Element Separation

The image above presents the modified station prefab divided into each of the 27 components. The overall modified station is roughly 30m cubed, allowing for 10m cubed sections. Such is large enough to create roughly a two meter gap between the structural members allowing a person to walk through, while furthermore allowing enough room for the required number of doors to be placed upon the installation with the main sectional levels of the structure. Finally in the final scaling and separation I had ensure I considered the point that people would be walking on top and beneath the installation planes, thus meaning with it positioned in the centre of each component that there would remain enough room, while additionally some particular members were required to be reformed as discovered in the first Sandbox version of the installation.

No comments:

Post a Comment